Container home windows coming soon…

From the get-go, the plan had been to fill the opening where the standard container doors go with floor-to-ceiling windows. Unfortunately, budgeting issues caused me to delay that mostly aesthetic aspect (or so I thought) in favor of paying for more practical things that I could actually afford.

The unexpected snafu caused by that delay only became apparent as the weather grew colder. Because the natural doors have no insulation and are essentially one sheet of metal, the inside of the doors basically gets as cold as the outside of the doors. When the weather sank into the teens in Oklahoma City during December, I was getting massive amounts of condensation on the interior of those doors, which is right behind my couch. Further, that condensation was eventually freezing, so it was like I had a big block of ice right in my living room.

So much for thermal efficiency.

Through a combination of determined miserliness and motivation borne from being uncomfortable at home, I finally pulled the trigger on calling a regional company’s OKC offices, Thermal Windows, and getting a quote on floor-to-ceiling glazing for that much-neglected yet highly costly aspect of the project.

Decisions, decisions

I was struck with a bit of deja vu upon being presented the options for solving my end-cap problems. Looking at the image of computer renderings above, the models on the left and right sides were quoted far cheaper than the one in the middle. At the same time, the one in the middle was the one I really liked. After some hem and hawing, I decided to go with what would make me happiest, and soon enough a representative came out to get the measurements exactly right.

These will be similar to the Pella windows installed throughout the rest of the container: dual-paned and thermally efficient, with a layer of argon gas filling the inside space between the panes.

Hiccups in the process

I was told from the time I ordered the windows (late December) that they would not be available for install until sometime in mid-February. Once again my ignorance with regard to lead times in contracting for residential construction needs was laid bare, but at least I had my foot in the door.

Or so I thought.

There was some confusion as to the color of the window trim I had chosen. I forget the specifics, but it was something like the color I had selected originally wound up being unavailable in that particular material. So, I had to re-submit a signed order form. Then, I received a phone call one Friday morning in January from the install guy who had originally came out to do the initial measurements. He told me he was notified earlier that week that the factory had “lost” the measurements, which had “never happened before.” Although he could not properly explain why he waited several days to tell me of this delay, I advised him to come out right then to redo the measurements.

Waiting game

Today is Feb. 10, and I haven’t heard a peep from Thermal Windows. I expect they could be coming to install any day now, and I can’t wait to take those pictures, but dang: not a very professional company so far. We’ll just have to wait and see how their final install works out and if they’re willing to give me a discount should the delays add up to a significantly longer than expected install date.

Published by

josh

I live and work in Oklahoma. I began developing a shipping container home in 2013. I'm interested in minimalism, efficiency and sustainability as aesthetics and philosophies. Please comment or email me for more information: josh@highcubeindustries.com.

2 thoughts on “Container home windows coming soon…”

  1. Thanks for writing this. You do a great job articulating your thoughts and I
    really enjoy reading your site. You’ve created a very valuable resource here.
    Just wanted to say keep up the good work!

Leave a Reply

Your email address will not be published. Required fields are marked *